CONSTRUCTION OF A BALCONY ON STEEL HULL, 40 M MOTOR YACHT
MAIN ACTIVITIES FOLLOWED:
- Scanning and surveys for 3D structure reconstruction and subsequent FEM analysis for feasibility assessment and hull intervention methods;
- Calculations, design and definition of plant – functional, dimensional and aesthetic characteristics of the plant to be built;
- Dismantling of furniture, insulation and systems from the area subject to intervention (md owner studio, ld guest cabin and ld crew mess);
- Marking of the processing area and preparation of the same for cutting and subsequent hot working…
- Realization of hull opening and sheet metal landing;
- Reconstruction of the entire perimeter and preparation of the new balcony venue;
- Assembly of mechanical components and pre-assembly of the tilting door;
- Modification and adaptation of existing systems to a new structure (roads cables, air vents, etc.)
- Tilting door grounding for painting;
- Venue preparation, assembly of glass, automatic stainless steel pulpit and various accessories;
- Installation of electrical and hydraulic system components for running and movement system;
- Interface with yacht monitoring system;
- Final assembly of the tilting door on board
- Completion of the tilting door set-up with installation of teak cladding, courtesy and signal lights;
- Commissioning and execution of all the system tests with verification of functionality in emergency mode;
- Completion of furnishings in the areas subject to intervention;
- Choice, management and control of contractors’ work;
- Verification of technical requirements and documentary aspects;
- Coordination and planning of activities on board;