Main Works carried out:

  1. Crew mess
  • Complete wrapping of the area;
  • Flooring replacement;
  • Replacement of existing marble top with new one in corian;
  • Restoring operation and service of appliances;
  • Upgrade AV and navigation systems.
  1. Laundry makeover
  • Complete dismantling and reconstruction of new laundry area to optimize spaces as per Customer request, including:
  • Refurbishment of air and water systems;
  • Insulation restoration;
  • New flooring and service on appliances and air ducts.
  1. Crew corridor and cabins renovation
  • Replacement flooring and wrapping in the corridor;
  • Detailed cleaning of all cabins with the removal of any plastic material;
  • Cleaning and sanitizing the fan coil and flooring replacement.
  1. Crew cabins bathrooms
  • General renovation crew bathrooms with silicone and grating remaking in the shower;
  • Detailed cleaning with removal of any plastic;
  • Toilet replacement;
  • Grey and black pipes cleaning.
  1. Various in the area
  • Testing and possible maintenance of valves in the bilge and/or hull;
  • Checking the operation of the bilge system;
  • Cleaning and treatment of fresh water tanks, including final water analysis;
  • Checking and replacing non-functioning underwater lights;
  • Complete verification and control of the electrical and lighting system;
  • Selection of materials to be used and finishes for the area according to the Client’s requests and assistance in choosing these;
  • Planning, coordination and supervision of the activities on board including management of aspects related to the purchase of the materials necessary for the work, chosen by the Client.